P 52
DTA Ph1 refinery Contd.
Flare system- Zeeco & Petron- Darton, Sanjeev Chikkalpatti, Rane
FM 200 System for PIBs- Kidde,Vijay Fire- Harish Salot
Fire water Monitors- HD Fire-Harish Dhramshi
Deluge valves system- Inbal&TechnoFire- Shimpshon& Praful sanghrajka
Fire&Gas System- Wormald
I have included major players only. There were many more who played their part but I am not able to recollect their names to mention here.
Having said that, let us recollect the specific instances which made my career development both high & low in these period of 39 months!
Story about overall plot layout and how did we arrive at allocating land area for respective ISBL.
Reliance/Bechtel had certain fundamental principles , utmost importance for meeting statutory guidelines for safety + Principal Licensor requirements. Added to that Vaastu compliance, sourced land contour, non-availability of frontal portion of land area to main highway etc. contributed many factors while arriving at the would be world largest refinery complex.
Out of these Safety, Vaastu Compliance and Licensor stream flow recommendation played very important role.
Green Belt: Though the Government Regulation call for only 50M Green Belt at periphery boundary of plot, due to non availability of that piece of land in the frontal area, we were forced to leave 800M space in front! But presently the story is different! In the beginning M/S BPCL were owning that land and they were thinking of establishing their tank terminal there, which never came. After a year or so, they realized that and then sold off to Reliance-where the mango forest has been established by Reliance and Reliance also deals with mango pulp making.
Coming to Vaastu factors Reliance has engaged the services of one specialist consultant Dr M V Rao from Hyderabad for Vaastu studies. With Lat/Long demarkation marked, and identifying the high/low point paving of land area and studying the centre of gravity of earth forces, his recommendation of fire/water/high mountain and Mother's Womb etc. were marked in the overall plot drawing. That only caused to build DHA Pyramid at South West Corner of DTA plot adjoining 713 Fire water pond and PP flare, which was constructed using the concrete rubble generated during construction. Today also the portion of Mother's Womb plot is left vacant to comply that Vaastu studies. Contd.....
Key Aspects :- Technical issue, Team building, Ups&down
DTA Ph1 refinery Contd.
Flare system- Zeeco & Petron- Darton, Sanjeev Chikkalpatti, Rane
FM 200 System for PIBs- Kidde,Vijay Fire- Harish Salot
Fire water Monitors- HD Fire-Harish Dhramshi
Deluge valves system- Inbal&TechnoFire- Shimpshon& Praful sanghrajka
Fire&Gas System- Wormald
I have included major players only. There were many more who played their part but I am not able to recollect their names to mention here.
Having said that, let us recollect the specific instances which made my career development both high & low in these period of 39 months!
Story about overall plot layout and how did we arrive at allocating land area for respective ISBL.
Reliance/Bechtel had certain fundamental principles , utmost importance for meeting statutory guidelines for safety + Principal Licensor requirements. Added to that Vaastu compliance, sourced land contour, non-availability of frontal portion of land area to main highway etc. contributed many factors while arriving at the would be world largest refinery complex.
Out of these Safety, Vaastu Compliance and Licensor stream flow recommendation played very important role.
Green Belt: Though the Government Regulation call for only 50M Green Belt at periphery boundary of plot, due to non availability of that piece of land in the frontal area, we were forced to leave 800M space in front! But presently the story is different! In the beginning M/S BPCL were owning that land and they were thinking of establishing their tank terminal there, which never came. After a year or so, they realized that and then sold off to Reliance-where the mango forest has been established by Reliance and Reliance also deals with mango pulp making.
Coming to Vaastu factors Reliance has engaged the services of one specialist consultant Dr M V Rao from Hyderabad for Vaastu studies. With Lat/Long demarkation marked, and identifying the high/low point paving of land area and studying the centre of gravity of earth forces, his recommendation of fire/water/high mountain and Mother's Womb etc. were marked in the overall plot drawing. That only caused to build DHA Pyramid at South West Corner of DTA plot adjoining 713 Fire water pond and PP flare, which was constructed using the concrete rubble generated during construction. Today also the portion of Mother's Womb plot is left vacant to comply that Vaastu studies. Contd.....
Key Aspects :- Technical issue, Team building, Ups&down